72-Hour Miracle: Supporting a Silicon Valley Startup’s Deadline
Inquiry by email Inquiry by whatsapp
We recently partnered with a boutique robotics firm in San Jose that was facing a "make or break" demo for their Series A funding. They needed a 6-layer complex board, but their previous supplier had failed the impedance test.
The Challenge:
The customer provided the Gerber files on a Tuesday, requiring the physical boards in California by Friday morning. The design utilized 4-mil trace/space and required tight impedance control ($\pm 5\%$) for their high-speed signal processing unit.
Our Solution:
As soon as the files hit our system, our CAM engineers performed a thorough DFM (Design for Manufacturing) check. We identified a potential short-circuit risk in the via-in-pad design and suggested a modification within 2 hours. Using our dedicated "Quick-Turn" line, we finished the fabrication in 24 hours.
The Result:
Through our logistics partner (FedEx International Priority), the boards arrived at the customer's door in 68 hours. The demo was a success, and we are now their primary partner for the production phase.